ISO 9001:2015 & IATF 16949 CERTIFIED

Metrology protocols calibrated to ±0.002mm

Every core, cavity, and mold base undergoes complete multi-axis CMM verification, strict material heat-lot analysis, and comprehensive dimensional reporting prior to T0 trial runs.

±0.002mm

CMM verification limit

100%

Material heat-lot tracing

24 hrs

DFM reporting window

Inspection Stages

Systematic verification workflow

01
02
03

Incoming Steel Analysis

In-Process Electrode Checks

Final CMM Layout

Hardened tool steel grades are spectroscopically analyzed and certified against heat-lot documentation before machining begins.

EDM electrodes and critical core inserts are verified on optical comparators during multi-axis CNC machining sequences.

Fully assembled mold bases and trial parts undergo laser-scanned CMM coordinate inspection with comprehensive data sheets.

Dimensional Sign-Off Standards

First Article Inspection Reports and material heat-lot documentation accompany all shipments, ensuring absolute traceability across high-cavity configurations.

Examine our sample inspection report templates

Direct engineering documentation is available to qualified procurement teams and supplier qualification auditors.